Minimise downtime and closure of wards

Wall protection systems are designed to minimise the risk of damage caused by bumps, scratches, marks and dints from wheelchairs, beds and trolleys. Puncture holes and deep gouges into the walls require regular filling, sanding and painting. The repair process can take four days or more, often requiring the whole wall to be re-painted, causing much disruption to patient care.

The reason many hospitals put off refurbishments is they had not found any solution to avoid lengthy shut downs. An Altro wall solution has proven to be one to two days quicker than any other refurbishment process they have considered.

Why install Altro Whiterock?

  • Extensive stock from a UK manufacturer

  • Tested to BS EN438-2-1991 and Charpy ISO 179

  • 2.5mm high-grade uPVC

  • Consistent product quality for UV stability, colour consistency and chemical resistance

  • Altro Whiterock, when installed correctly, has an industry-leading, 20-year guarantee. As we developed wall cladding over 30 years ago, we know our guarantees are guaranteed

  • Free Altro technical support pre-, during and post-installation

  • Lots of colour choice for design flexibility and option for bespoke printed designs

  • View our Impact testing here

Posted: 23/04/2018 08:00:00 by Heather Mussett | with 0 comments